Soil Nail and Stainless Steel Netting Project
Posted on 10th December 2023 at 11:17
Dover Priory Soil Nail and Stainless Steel Netting 2020.
With over 2500m square of stainless steel netting and over 170 soil nails drilled to 5 meter depths, this is the largest project SEA have undertaken to date.
Lots of hard work resulted in a great finished product to hand back to Network Rail.
This project shows off what SEA are capable of producing with a high level of detail and professionalism.